Major Maintenance FY 22
Project Manager: Roseann Sillasen
2022 Summer Construction Location Map (interactive)
2022 Summer Construction Location Map (static)
Capital & MM FY23 Projects - Construction Completed Summer 2022
___________________________________________________________________________________________________________________
Work performed and completed Summer/Fall 2020 & Summer/Fall 2021
-Capital & MM FY21 Projects - Construction Completed Summer 2020
-Capital & MM FY22 Projects - Construction Completed Summer 2021
___________________________________________________________________________________________________________________
Lien Waiver Links:
|
Building Name |
Address |
Description of Work |
SLF |
Clark Hall - Area Coordinator Apartment |
268 Church Street |
Carpet Replacement |
ACAD |
Schonberg Dance Studio |
247 Pine Street |
Reinforce Walls w/ acruvyn panels. Construct new all gender bathroom in lobby. |
ACAD |
Exley Science Center |
265 Church Street |
Restore Lavatories/new toilet paritions (1st flr mens/2nd flr M/W, 5th flr M/W) |
SLF |
Student WF |
11 Vine Street |
Replace Windows |
SLF |
The Bayit |
157 Church Street |
Kitchen Renovation with Flooring & Lighting |
SLF |
Student WF |
162 A/B/C Church Street |
Kitchen Renovation/ Bathroom Renovation / Window Replacement / Exterior Paint |
SLF |
Russian House |
163 High Street |
Kitchen Renovation / Lighting |
SLF |
Undergrad Woodframe |
227 Pine Street |
Kitchen Renovation / Lighting |
SLF |
Student WF |
38/40 Brainaerd Avenue |
Bathroom Renovations |
ACAD |
Zilkha Gallery |
283 Washington Terrace |
Window film, UV protection (In review) |
ACAD |
Russell House |
350 High Street |
Paint Exterior |
SLF |
Non Traditional Dorm |
200 High Street |
Install New Wood Floors/Vinyl Tile |
SLF |
Undergrad Woodframe |
15 Fountain Avenue |
Kitchen Flooring/New Electrical Service/Lighting |
ATH |
Bacon Fieldhouse |
161 Cross Street |
South Elevation exterior wall repairs/paint |
SLF |
Undergrad Woodframe |
47 Brainerd Avenue |
Window Replacement / Vinyl siding |
SLF |
Dormitory |
Butterfield Complex |
Window Treatment Replacement |
SLF |
Dormitory |
Foss Hill 7 and Foss Hill 6 |
Flooring Replacement; Foss 7-1st, 2nd & 3rd floors. Foss 6-basement level |
SLF |
Undergrad Woodframe |
18 Brainerd Avenue |
Kitchen Renovation |
SLF |
Undergrad Woodframe |
59 A/B Home Avenue |
Kitchen counters and flooring replacement & Bathroom flooring |
SLF |
Undergrad Woodframe |
131 Cross Street |
Kitchen & Bathroom Renovation |
SLF |
Undergrad Woodframe |
48 Home Avenue |
Kitchen Renovation / Window Replacement |
ACAD |
Fisk Hall |
262 High Street |
4th Floor Corridor Flooring / Paint |
ATH |
Freeman Athletic Center |
161 Cross St |
Athletic Training Room – Epoxy flooring installation |
ATH |
Freeman Athletic Center |
161 Cross St |
Natatorium- Interior Restoration / construct all gender bathroom |
SLF |
Undergrad Woodframe |
148 Church St |
Exterior Paint/carpentry repairs |
ADM |
North/South College |
High St |
Install pavers at open connector |
SLF |
Undergrad Woodframes |
various |
1st floor structural reinforcement |
SLF |
Undergrad Woodframe |
42 Miles Ave |
Bathroom floor replacement |
SLF |
Undergrad Woodframe |
59 Pearl St |
Flooring replacements / lighting |
Adm |
291 Main St |
291 Main St |
Fire Alarm upgrade |
ACAD |
CFA Art Studio North |
289 Washington St |
Door restoration in Art Studio 101 |
ACAD |
Olin Library |
252 Church St |
3rd floor carpet replacement (Fall) |
SLF |
Clark Hall |
268 Church St |
Common Area seating upholstrey replacement (Fall) |
ACAD |
CFA World Music Hall |
40 Wyllys Ave |
Lower level-new carpet |
ACAD |
Classrooms |
various |
Furniture replacements |
|
Building |
Address | Description of Work |
SLF |
Foss Hill 5 roof replacement |
57 Foss Hill Drive |
Roof Replacement |
SLF |
Butterfield B Pod 3 roof replacement |
20 Huber Avenue |
Roof Replacement |
SLF |
Bennet Hall asphalt roof |
35 Foss Hill Drive |
Roof Replacement |
ATH |
Freeman Athletic Center Natatorium roof replacement and new roof hatches |
161 Cross Street |
Roof Replacement |
SLF |
Resource Center & Office of Religious Studies |
167/169 High Street |
Roof Replacement |
ADM |
Davison Art Center/Alsop House |
301 High Street |
Built In Gutter Repairs north elevation |
SLF |
Bayit |
157 High Street |
Cut in New Parapet Scupper |
________________________________________________________________________________________________________________
AR=Alan Rubacha arubacha@wesleyan.edu
ACAD=Academic Admin=Administrative Infra=Infrastructure RP=Rental Properties SLF=Student Life Facilities SLF-WF=Student Life Facilities-Woodframes ATH=Athletics
CPP=Central Power Plant AAF=Academic & Administrative Affairs MH=Manhole DDC=Direct Digital Controls GFI=Ground Fault Interrupt SW=southwest ADA=Americans with Disabilities Act
CFA=Center for the Arts